Dispute Boards

Avoidance and Resolution of Disputes

Concept

15 to 20% of the incoming new cases every year to ICC Court of International Arbitration is for the disputes relating to construction and engineering contract. As such, the construction contracts are not free from differences of opinions or disputes. This is because of uncertainties which affect time and cost of the projects.

A mere difference of opinions of the parties in the interpretation of the contract documents often develops to a serious dispute. If the parties fail to settle the dispute by negotiation, they may go to arbitration or litigation. Every party wants to avoid arbitration or litigation because they know arbitration and/or litigation take time and need substantial expenditure. Moreover, in arbitration and litigation, the relationship between the parties gets worse and the project cannot be completed successfully (and someone will loose face in the end!).

The best way to resolve disagreement is to prevent it from becoming a formal dispute. The primary duty of a Dispute Board (“DB”) is to avoid disagreements becoming disputes. Making a “Decision” or “Recommendation” is a secondary role of the DB.

A DB is made up of three (or one depending on the size and complexity of a project) members who are experienced in and knowledgeable about the type of the construction, interpretation of contract documents and the DB process and are absolutely independent and impartial. A DB is set up at the outset of a project and the DB Members are to be given the Contract Documents such as Conditions of Contract, Drawings, Specifications and Programme so that the Members can be conversant with the project. The DB visits the Site regularly, say quarterly, to meet the Site people and to observe the progress and problems, if any, of the project. Between the Site visits, the Engineer or the Parties send the DB Members the Monthly Progress Report, Claim Notices and other important correspondence to keep the Members informed. The DB is part of the construction team who assists the parties in avoiding claims and settling disputes by amicable negotiations. If the parties fail to settle disputes, they are referred to DB for determination. Since the DB members are familiar with the contract documents and the Site operation and progress of the project, it will not take much time to judge the dispute. Even if the determination is rejected by one or both parties, it will be the basis for further negotiation in an amicable manner. Thus, the benefit of DB is prevention of disputes and early settlement of disputes without embedding adversarial attitudes.

History

The concept of DB was established during the use of “a four-person joint consulting board” in the Boundary Dam and Underground Powerhouse Complex Project in the mid-1960s in Washington State and the tunnelling industry first used the DRB (Dispute Review Board) process in 1975 during construction of the second bore of the Eisenhower Tunnel in Colorado. It was an overwhelming success; The DRB heard three disputes during construction and the DRB Recommendations were accepted. All parties were pleased at the end of the project. In 1980 World Bank promoted a DB (then called “Claims Board”) on El Cajon project in Honduras, which was also successful1. In 1995 World Bank Standard Bidding Document published modified FIDIC2 conditions which deleted the usual provision of the “Engineer’s Decision”, giving this task to a DRB.

Benefit of using DB

Typical and Traditional Claim Management

Too often, even though the contract calls for a DB, the parties see the DB as "too expensive" and because they have no disagreements at the beginning of the contract (the parties being "newly weds") so they postpone establishing the DB and say "We will establish the DB if we have a dispute which we cannot settle by friendly discussion." Or they establish the DB but insist that the DB Site visits be only annually, instead of quarterly, so they can "save money". These attitudes reflect lack of experience in use of DBs and lack of understanding that a properly established and maintained DB is one of the most valuable economies they can accomplish.

What happens if there is no DB? Typically when claims become serious disputes, both the Contractor and the Engineer begin exchanging elaborate claims documents, typically prepared with the help of consultants such as claims consultant companies, experts in delay analysis, independent specialists such as geologists or geophysicists, consulting quantity surveyors, and lawyers (both those internationally prominent and local lawyers of the country of the contract). All of these are expensive helpers! Those used by the Engineer of course are paid for ultimately by the Employer.

Preparation of these documents takes more than money; it takes a lot of time. Inevitably the documents must be reviewed by the parties’ managements. Meetings to review and discuss the documents of both sides will be held, week after week, month after month, as the parties struggle with each other for victory without having to go on to the further expense and delay of arbitration. Typically, the struggle will continue even after construction has been completed. The Employer will have to keep staffs of the Engineer working longer than the case if claims had been resolved by the time construction was complete. Similarly, instead of being able to release all staffs to other projects, the Contractor has to keep its key Site staffs involved, and if its camp has been demobilized, may have to find commercial office space, and may have to find rental accommodation locally for its claim staffs. It is likely that some if not all of the experts who have assisted the parties in preparing the claims documents will be involved in these meetings. As with document preparation, if the experts are from outside the project country, significant transportation and accommodation costs are involved in attendance at meetings. Further, if eventually success is obtained in negotiating an amicable settlement, a very large amount of senior management time will have to be devoted to those negotiations. Sometimes it is even necessary to employ a mediator to assist the parties, and to avoid arbitration.

Obviously, it is very difficult to budget for these costs. By contrast, a DB can be planned for and budgeted from the outset3.

True Benefit of using DB

So let us turn to what happens if a DB is established at the outset and operated properly. The DB will be familiar with the contract from inception, and from its Site visits plus reading of regular written reports received between Site visits, the DB will be familiar with the progress of the construction. From experience on similar projects elsewhere, the DB will be alert to the principal areas of risk and potential problems. The DB will have the experience to assist the parties in avoiding conflict, and when disagreements do arise, in guiding the parties so that amicable settlement is achieved without elevating the disagreements into formal disputes. The most successful DBs are those which never have to deal with formal written submissions and hold hearings. Instead, using papers already in the hands of the persons doing the day-to-day management of the contract, and informal discussions, they can guide the parties to mutually acceptable resolutions. Typically, only the Site management staffs are involved with the DB, and the involvement of senior management of the parties is not required to reach resolution of disagreements on Site.

If for some reason a particular disagreement unavoidably becomes a formal dispute, the DB will be resolved to reach its own decision on the dispute quickly, and will control the production of documents to keep them to a minimum, keep any hearing to the minimum duration necessary to give each party a fair hearing, and then will prepare its decision under a time limit to which they are bound by their contracts with the parties. They will seek to give a unanimous opinion, and even if it is not fully acceptable to both parties, it very often forms the basis for further discussions and negotiations between the parties and leads to a settlement without either party initiating arbitration. Also, typically in contracts with DBs, all disagreements arising during construction will be resolved by the time construction is complete.

Clearly, the cost of a DB is a saving compared to the traditional end-of-the-contract battles over massive claims documents (and counter-claim documents!) dragging on many months after construction is complete.

Not Only in the Construction Industry but in Other Industries

A standing DB can be used efficiently not only in the construction industry but in other industries or business such as a licensing agreement, a sole distributor agreement and an operation and maintenance agreement.

Dr. Omoto experienced a Sole Member Dispute Board of a long term operation and maintenance (o/m) agreement for a gas turbine power plant. This service is described in details in the Projects examples.


1. The late Mr. Al Mathews, who was involved in both Boundary Dam and Eisenhower Tunnel projects, persuaded the Contractor and the Government to use a DB in El Cajon project. He was the founder and the first Chairman of the Dispute Resolution Board Foundation (DRBF), Seattle, Washington, USA http://www.drb.org back 2. Fédération Internationale des Ingénieurs-Conseils (International Federation of Consulting Engineers) http://fidic.org/ back 3. In case of Japanese ODA (Official Development Assistance) Loan by JICA (Japan International Cooperation Agency, the DB cost is considered to be an essential cost for the project implementation, thus it it an eligible cost under Japanese ODA Loan. On the other hand, cost for arbitration is not covered. (3.2 Can DB cost be financed under JICA loan? Appendix 3: Consideration at Pre-Implementation Stage, JICA Dispute Board Manual, March 2012, http://www.jica.go.jp/.../pdf/guide09.pdf posted on http://www.jica.go.jp/.../index.html back